After the kiva is completed (at least the structure) the rest of the courtyard will be enclosed with a knee fence and gates at the front. The gates will be swung from the bunker NE corner and a wall made from the concrete which was cut from the door and windows. This wall will be a rubble style with the North face appearing to be crumbling down to the knee wall. The knee wall will be of various heights (as rubble) and in the center topped with an arch then continued to the kiva. Drawing below shows the general concept.
The construction of the wall will be metal frame covered with EPS and drivit. This wall will be anchored with concrete each four feet. There will be no attempt to make it water tight other than sloping the earth away from it on both sides.
No comments:
Post a Comment